In partnership with the Gwinnett DOT, the CID prepared a traffic analysis, roadway layouts, and cost estimates for intersection improvements along Pleasant Hill Road from Old Norcross Road to Club Drive. The CID collected traffic volume data to forecast future traffic conditions. The traffic analysis included five major components: data collection, crash analysis, existing capacity analysis, design traffic projections, and future capacity analysis. As part of the six-month analysis, the CID analyzed the pedestrian and bicycle movements along the corridor and at each location when developing recommendations for the ideal roadway configuration at each intersection. Plans are underway to move forward with several of the identified intersection improvements. Pleasant Hill Road Corridor Final Report and Appendix.
As a result of the study, the Pleasant Hill Road at Koger Boulevard/Crestwood Parkway intersection improvement project was identified. The project consists of intersection improvements to add dual left-turn lanes on eastbound and westbound approaches. Construction began April 2026.
